Gluone: AI-based project intelligence for hardware

AI intelligence for hardware

When your project changes, Gluone shows you what to ask next.

A motor swap or a late quote can change a build. See which costs, deadlines and tests need another look.

Robot arm with its elbow joint exploded, showing the old motor and the replacement BLDC motor highlighted in amber.
Robot elbow motor replacement
  • EMCWill the new motor pass EMC testing? The replacement hasn’t been tested.
  • PricingDoes this build qualify for the target price? The price break starts at 1,000 units.
  • Thermal fitWill the existing heat spreader fit the new motor housing?

How Gluone works

Connect the project knowledge

Bring conversations, tickets, wiki pages, CAD files and orders into one project knowledge graph. MCP (Model Context Protocol) gives Gluone a standard way to connect to your tools and access project context.

Capture the change

A supplier updates a price, a delivery slips, or engineering revises a drawing. The graph database connects the update to affected parts and commitments, while AI models accessed through OpenRouter help interpret it.

Surface the next question

When a delivery date moves, Gluone asks, “Will we have enough parts for the next build?” See the question and its supporting records from your phone or desktop.

Select a blinking part to run regression checks. Open Inspect parts to explore all 12 components. Illustrative scenario with sample data.

What changes when a part changes?

See which checks catch a design change and which questions your team can answer from the project records.

Unit tests

Four socket-head screws aligned with a mounting plate, with the added fasteners highlighted.

Fasteners added

What gets flagged?

The released BOM still lists the previous count.

Required quantity per assembly in the approved change versus the quantity in the released bill of materials.

Copper ring terminal aligned with a bare metal grounding pad.

Grounding point specified

What gets flagged?

The drawing allows coating on a contact surface that must remain bare.

The electrical bonding requirement versus the finish callout on the released mechanical drawing.

Cable guide lifted above the harness and its mounting rail.

Cable guide revised

What gets flagged?

The guide is present in CAD and absent from the build list.

The guide marked for installation in the CAD assembly versus the items in that assembly’s released BOM.

Matching hex bolts with different strength grades marked on their heads.

Fastener substituted

What gets flagged?

The thread matches, but the proposed bolt has a lower strength rating.

The replacement bolt’s specified strength class versus the class approved for the joint.

Project questions

Can we replace this connector?

A proposed connector swap raises questions across the assembly and PCB. Gluone brings together the affected parts, supplier options and cost impact so the team can review the change.

Connector replacement
PCB footprint and linked assemblies
Sourcing decision
Supplier options, price and lead time
Connector swap shown on the original Gluone CAD assembly, restyled in silver and carbon gray with amber highlights.

What parts are affected by this enclosure change?

A revised housing can affect mounts, fasteners and the parts around it. Gluone traces those links through the bill of materials and open tasks to show what needs another look.

Affected hardware
Mounts, fasteners and neighboring parts
Follow-through
BOM updates and linked engineering tasks
Enclosure change shown on the original Gluone CAD assembly, restyled in silver and carbon gray with amber highlights.

Which supplier quote is current?

When a quote arrives, Gluone connects it to the part and its revision. Compare the approved offer with other vendors on price, order quantity and delivery timing.

Quote context
Part revision and approval status
Commercial terms
Unit price, minimum order and lead time
Supplier quotes shown on the original Gluone CAD assembly, restyled in silver and carbon gray with amber highlights.

What changed since the last assembly review?

Gluone brings design revisions, BOM changes, purchasing updates and open tickets into one review. See which changes create questions for the next build.

Since the checkpoint
Design, BOM and procurement changes
What needs attention
Open tasks and newly introduced risks
Assembly review shown on the original Gluone CAD assembly, restyled in silver and carbon gray with amber highlights.

Which tasks are blocking procurement?

An order can depend on an approval or a specification that lives elsewhere. Gluone follows those links to show which unresolved tasks are holding up purchasing.

Before ordering
Missing specifications and open approvals
Affected work
Engineering tasks and purchase requests
Procurement blockers shown on the original Gluone CAD assembly, restyled in silver and carbon gray with amber highlights.

How does this design update affect cost and lead time?

Gluone links a changed part to supplier pricing, inventory and logistics. Bring cost and delivery questions into the design review while there is still time to act.

Cost impact
Updated quotes and order quantities
Delivery impact
Inventory, supplier lead time and logistics
Cost & lead time shown on the original Gluone CAD assembly, restyled in silver and carbon gray with amber highlights.

Use case 1 of 6. Connector swap.

Put your next build to the test.

Bring one assembly, one supplier quote and one decision your team needs to make. Upload your project to the Gluone sandbox and try the change on your own parts.

Will the lower-priced spindle connectors still arrive before assembly? Follow the quote to the build date, see which checks fail and open the requirement behind each finding.

Gluone demo with the rotating head selected in the LiDAR model, its assembly connections on the right and a supplier price in chat.

Let’s talk hardware.

Tell us about your project or the change you’d like to try.

Direct email team
Topic

Try Gluone