Connect the project knowledge
Bring conversations, tickets, wiki pages, CAD files and orders into one project knowledge graph. MCP (Model Context Protocol) gives Gluone a standard way to connect to your tools and access project context.
AI intelligence for hardware
A motor swap or a late quote can change a build. See which costs, deadlines and tests need another look.
Bring conversations, tickets, wiki pages, CAD files and orders into one project knowledge graph. MCP (Model Context Protocol) gives Gluone a standard way to connect to your tools and access project context.
A supplier updates a price, a delivery slips, or engineering revises a drawing. The graph database connects the update to affected parts and commitments, while AI models accessed through OpenRouter help interpret it.
When a delivery date moves, Gluone asks, “Will we have enough parts for the next build?” See the question and its supporting records from your phone or desktop.
See which checks catch a design change and which questions your team can answer from the project records.

The released BOM still lists the previous count.
Required quantity per assembly in the approved change versus the quantity in the released bill of materials.

The drawing allows coating on a contact surface that must remain bare.
The electrical bonding requirement versus the finish callout on the released mechanical drawing.

The guide is present in CAD and absent from the build list.
The guide marked for installation in the CAD assembly versus the items in that assembly’s released BOM.

The thread matches, but the proposed bolt has a lower strength rating.
The replacement bolt’s specified strength class versus the class approved for the joint.
A proposed connector swap raises questions across the assembly and PCB. Gluone brings together the affected parts, supplier options and cost impact so the team can review the change.

A revised housing can affect mounts, fasteners and the parts around it. Gluone traces those links through the bill of materials and open tasks to show what needs another look.

When a quote arrives, Gluone connects it to the part and its revision. Compare the approved offer with other vendors on price, order quantity and delivery timing.

Gluone brings design revisions, BOM changes, purchasing updates and open tickets into one review. See which changes create questions for the next build.

An order can depend on an approval or a specification that lives elsewhere. Gluone follows those links to show which unresolved tasks are holding up purchasing.

Gluone links a changed part to supplier pricing, inventory and logistics. Bring cost and delivery questions into the design review while there is still time to act.

Use case 1 of 6. Connector swap.
Bring one assembly, one supplier quote and one decision your team needs to make. Upload your project to the Gluone sandbox and try the change on your own parts.
Will the lower-priced spindle connectors still arrive before assembly? Follow the quote to the build date, see which checks fail and open the requirement behind each finding.
